24/7 Emergency Callout
License Details: BC 104534 | PL 8458 | EC 13618 GF 15030 | BF 5033

Renovation. Nedlands.

Renovation. Nedlands.

Multi-room renovation of a house in Nedlands.

Unique solutions:

We collaborated with our customer to create some of the most unique custom cabinetry we’ve ever seen. Whether is was angled cabinets in the ensuite or a shorter depth kids vanity, we wanted our customer to get the most amount of functionality possible out of a space.

Project process:

  1. Free on site quote
  2. Final measure and colour selection
  3. Plans
  4. Set project start date
  5. Pre-start with project manager
  6. Schedule sent to customer
  7. Skip bin arrival
  8. Floor protection matting
  9. Demolition
  10. Rough in and moving of services (electrical, plumbing and gas)
  11. Wall patching and rendering
  12. Floor screed
  13. Waterproofing
  14. Custom cabinetry and stone
  15. Tiling
  16. Reconnecting of services (electrical, plumbing and gas)
  17. Final fit off
  18. Painting
  19. Professional clean

What our clients had to say

Kyle and Matt,

Susy and I wanted to say a big ‘thank you’ to you and the rest of the Jewelbic team for a very well – planned and diligent effort with our recent renovations. As if it wasn’t enough to do a couple of bathrooms, a powder room and laundry, we also threw in the removal of the large tiled floor in the lounge, kitchen and hallway, so we could lay some Jarrah boards.

From our side the project was close to seamless which, in a tightening market for trades and the lingering backdrop of Covid, was both remarkable and appreciated. And in spite of having to work across two differing sections of house – 1940s and 2000s – each with some issues to deal with, the work standard was of a very high standard throughout.

As was the overall end result.

All of the team were a pleasure to deal with. They were timely, friendly and courteous and went out of their way to make sure that we ended up with what was intended, albeit a few quirks and changes along the way.

Thank you again guys, and our best wishes in what remains a somewhat difficult period of time for all.

Kind regards

Andy and Susy

CLIENT:
Residential

PARTNERS INVOLVED:
Jewelbic Brothers

PROJECT DURATION:
10 weeks – 2 stages
With a break in the middle

WORK TYPE:
En-suite
Powder room
Laundry
Kids’ bathroom
Flooring